Below are a few of the projects we have worked with our clients to deliver. Ranging from stripping out to polishing the reception desk as we have finished a complete refurb and fit out.

Project: Lighterman House

Commercial

Client: Kitt

Duration: 10-12 weeks

Works:

  • Strip out
  • Stud walls
  • Glass partitions
  • Flooring
  • Full decoration
  • M&E (mains power, lighting, data, fire, plumbing)
  • Joinery
  • Fire Doors
  • Site management
  • Cleaning

Project: PD PORTS Billingham

Industrial

Works:

  • 4 x Dock levels Mezzanine Floor
  • Frame Work & Secure Railings
  • Site management
  • Cleaning
  • Protection against the elements in a coastal location
  • Full specialist painting
  • New crisp fresh finish

Project: Hilliers Three Legged Cross

Retail

Client: Hilliers

Duration: Carried out over a 12 month period

Works:

  • Strip out
  • Stud walls
  • Various suspended ceilings
  • Various joinery
  • Decoration
  • External timber cladding
  • Aluminium doors / steel doors and roller shutter.
  • All lighting

Project: East One Aldgate

Commercial

Client: Kitt

Duration: 10-12 weeks

Works:

  • Stud walls
  • Decoration
  • Lighting and electrics
  • Various joinery
  • Internal bifold doors
  • Flooring
  • Site management
  • Builders clean

Project: Rothley Wolverhampton

Industrial

Works: Impact damage from HGV’s

  • Full inspection
  • Appointed a structural engineer
  • Review the Engineers report on damage to concrete surround and biscuits.
  • Repaired dock level shelter
  • Replaced all surrounding cladding
  • Resetting of the dock leveller to correct position
  • Serviced dock leveller

Project: 33 Cavendish Square

Commercial

Client: Kitt

Duration: 8-10 weeks

Works:

  • Strip out
  • Stud walls
  • Glass partitions
  • Flooring
  • Full decoration
  • M&E (mains power, lighting, data, fire, plumbing)
  • Joinery
  • Cleaning
  • Site management

Project: MayBrook

Industrial

Duration: 3 weeks

Works:

  • Strip-out
  • Reconfiguration of office space
  • New kitchenette
  • New WC
  • Internal doors
  • Steel doors
  • Decoration to all walls
  • Preparation to floor and painting
  • High level clean